PAINTING FACILITIES AND RELATED PRODUCTS

YouTube


GALATEK has completed the PP line for HTP s.r.o.

29.12.2014 09:20

GALATEK has completed the PP line for HTP s.r.o.

Another important project has been completed at the end of summer – the plastic powder coating line for HTP s.r.o., Žirovnice. Following several consultations the line lay-out has been developed for the existing room with great emphasis on top quality pre-treatment of parts.

The part pre-treatment workstation uses a manual degreasing booth and a three-chamber intermittent motion degreasing machine. A treatment plant has been designed for waste water disposal. Parts are dried in hot air dryer with direct circulation air heating.

The backbone of the entire line consists of the Power&Free conveyor which provides for independency of individual operation times and requires limited space only.



Quick contact

GALATEK a.s., Na Pláckách 647
584 01  Ledeč nad Sázavou
E-mail:

Sending news by e-mail

If you wish to receive newsletter please sign in.

Sending news by e-mail

to top ↑